My adventures learning about things like plumbing, electrical wiring, carpentry, building construction, painting and much more...
|
| | | |
|---|
| Install new bathroom sink drain and pipe | High | | | | Install new toilet flusher | High | | | | Hang all pictures | High | | | | Replace all light switches | High | | | | Tape and seal around bathtub | Normal | | | | Put covers on meditation mats | Normal | | October 25, 2009 | | Hang bookshelves | Normal | | October 24, 2009 | | Install bathroom shelves | High | | October 23, 2009 | | Install hot water tank | High | | October 23, 2009 | | Fix bedroom electrical outlet | Low | | October 23, 2009 | | Hang curtains | Normal | | October 23, 2009 | | Patch and paint large room | High | | October 21, 2009 | | Paint bathtub and bathroom piping | Normal | | October 21, 2009 | | Set up new internet connection | Normal | | October 21, 2009 | | Paint radiators | Normal | | October 20, 2009 | | Paint all doors and doorways | Normal | | October 20, 2009 | | Paint bathroom walls | Normal | | October 20, 2009 | | Grout bathroom tiles | Normal | | October 20, 2009 | | Pull all old nails from walls and doorways | Normal | | October 16, 2009 | | Remove old light switches | Normal | | October 16, 2009 | | Paint exercise bench | Normal | | October 10, 2009 | | Fix exploding radiator leaks | Normal | | October 5, 2009 | | Remove all old door handles | Normal | | October 3, 2009 | | New handle on front door | Normal | | October 3, 2009 | | Move to new apartment | Normal | | October 2, 2009 | | Replace bathroom flooring | High | | August 8, 2009 | | Install bathroom shelves | Normal | | July 20, 2009 | | Create seal around entire bathtub | Normal | | April 21, 2009 | | Fix toilet flusher | Normal | | April 16, 2009 | | Touch up paint in bedroom | Normal | | April 5, 2009 | | Hang new cork board | Normal | | January 4, 2009 | | Touch up paint bedroom and kitchen | Normal | | November 30, 2008 | | Install hot water in bathroom | High | | November 24, 2008 | | Fix kitchen electrical outlet | High | | November 24, 2008 | | Install second bathroom faucet | High | | November 17, 2008 | | Get a new mattress | High | | November 15, 2008 | | Replace kitchen radiator | High | | November 5, 2008 | | Install phone line and internet | Normal | | November 3, 2008 | | Winterize windows with sealant | High | | October 20, 2008 | | Winterize balcony door with foam | High | | October 20, 2008 | | Fix dresser knob | Normal | | October 20, 2008 | | Fix dresser clothing rod | High | | October 15, 2008 | | Repair windows in bedroom and kitchen | High | | October 15, 2008 | | Hang shower curtain and rod | Normal | | October 15, 2008 | | Install bathroom mirror | High | | September 30, 2008 | | Install hanging bookshelves | Normal | | September 15, 2008 | | Put up picture frames | Normal | | September 15, 2008 | | Caulking around bathtub | Normal | | September 12, 2008 | | Paint bathroom and bathtub | Normal | | September 12, 2008 | | Install toilet seat | Normal | | September 7, 2008 | | Install kitchen curtains | High | | September 5, 2008 | | Install new bathroom faucet | High | | September 5, 2008 | | Replace bedroom curtains | Normal | | September 5, 2008 | | Fix kitchen cabinet glass | Normal | | September 5, 2008 | | Fix bedroom electrical outlets | High | | September 2, 2008 | | Fixing carpet edges / Recut flooring | Normal | | August 31, 2008 | | Bring in washing machine | High | | August 30, 2008 |
Showing 57 items
|